Because the greenhouse is built on the roof, with limited space for construction and material stacking, which increases the difficulty of construction and has higher requirements for on-site operation scheduling capabilities. Kingpeng’s construction team has very strong scheduling capabilities to keep the plan” said the Manager Mr. Wang of the Buyer. Inspection and isolation greenhouses have higher requirements for light, moisture, temperature, humidity, pressure and automatic control. Each greenhouse area can choose to work in different environments of positive pressure, negative pressure and normal pressure, and has an independent computer control system for scientific research and experimentation.
Address
7th floor, Advanced Material Building, 7th Feng Hui Zhong Lu, Haidian District Beijing, PRC, 100094
info@chinakingpeng.com (International)
Phone
0086-10-58711562(Chinese)
0086-10-58711536 (English)
0086-10-58711568 Ext 679 (Russian)